Duct Smoke Detector Requirements For Make-Up Air & Heating Units.

3 MIN READ
Visit Cambridge's blog to learn whether a smoke detector should be installed on your new HVAC system, or why your inspector may have flagged this issue in the first place.

Read more

IndustrialRetrofitTechBlog.jpg

Industrial Heating, Cooling & Ventilation Retrofits with Cambridge Air Solutions

1 MIN READ
Our Director of Engineering Dave Binz describes how the Cambridge team approaches an industrial retrofit process, and the best way to get started getting answers about your project.

Read more

BurpingABuildingBlog.JPG

Whoever heard of burping a building?

2 MIN READ
We, at Cambridge are frequently involved with heating “spec” buildings. You know how it goes: a developer puts up the shell, pours the concrete slab, heats the building to a minimum temperature the closes it up with no plans for ventilation. At some point in the future, the developer signs up a tenant and proceeds with the tenant fit-out. That is where our story begins.

Read more

SSeriesThruWallTechBlog1.jpg

Cambridge Information Bulletin - Selection, Placement & Installation of an S-Series Unit - Thru Wall Mounting

2 MIN READ
Cambridge S-Series heaters can be installed in a variety of configurations. When considering industrial retrofit projects, there are several considerations that should be taken into account.

Read more

NoWeldingRequiredBlog.jpg

No Welding Required

2 MIN READ
For years we have worked with an industrial retrofit contractor. He often installed vertical S-Series heaters in locations where space was at a premium, both indoors and outdoors. Since Cambridge did not provide a stand for vertical units, he had a structural engineer design a four-legged stand made from 2” x 2” square tubing. The legs would be cut to length in the field and a base plate welded to the leg.

Read more

Rep Search

Please enter your information below so we can help you find the right rep for you.